Extension Work of P/M 100 KVA with 11KV OHL to Give Power Supply to Mr. Sultan Matter Al-Durai at Masrouq Area
Supply and Installation of an Elevator
Supply, Extension and Installation of Communication Wires for Phones and Computers
Extension the New 11kv Ug Cable with 4x1000 Kva GMT DSS
Power Supply
Engineering Design, Supply, Installation, and Commissioning of Pumps Sub-Cables (MAS) 801 in Central Pumping Station
Supply & Installation of Electrical Swing Door with Biometric Access Control System at Six Different Locations of Royal
Supply of Land Survey and Gps Tools (Pre-24-249)
Supply, Extension and Installation of Communication Wires for Phones and Computers (1)
Supply of Electrical Connection to Festival Land at Suhar